In memory of Pastor Bill Park
Goal: Build an observation deck facing the soccer field and mountains, creating a seating area for meetings, devotions, meals, etc.
Location area: Main building
Steps to complete project:
Goal: To continue to provide an area where campers can find a place to cool off during the hot Chilean summers.
Location area: Pool area
Steps to complete project:
Goal: Create a chapel area next to the main building where a small group can meet. Currently the camp church plant group is in need of a bigger place to meet. This would serve not only for the church plant, but also as a new meeting room for the camp ministry.
Location area: Next to main building
Steps to complete project:
Construct support pillars
Goal: To offer campers that know the Lord the opportunity to invite an unsaved friend to camp.
Description of Scholarship: The average cost of camp in 2024 was $50. The saved camper who brings an unsaved friend to camp, and the unsaved friend, both get the scholarship to enjoy a free week of camp.
Approximate Cost:
The original well dried up due to a prolonged drought in the area. An attempt to deepen the well was made but could only manage to go several feet. Water did come out, but not sufficient to irrigate, let alone to fill up the future pool.
Goal: To provide water for the soccer field, the bathroom building and other green areas
Location area: Next to the soccer field
Steps to complete project:
Goal: Provide stationary group games for children and teens
Location area: Next to girl’s dorm
Steps to complete project:
Goal: To have a green zone right outside the main building with adequate seating area (this also includes swings) to do follow up counseling sessions after meetings.
Location area: Next to main building
Steps to complete project:
Goal: Utilize the high ceiling to create a second floor above the current dining area (50×50 feet / 15×15 meters). This would give us another large meeting area, a game room and a control room for the first floor.
Location area: Main building
Steps to complete project:
Goal: To provide an outdoor covered cement pad to carry on different programs and activities.
Location area: Back of the soccer field
Steps to complete project:
Goal: Adequate housing for campers.
Location area: Current boys’ dorm
Steps to complete project:
Goal: To create an outside eating area near the main building area.
Location area: Near the main building
Steps to complete project:
Goal: To recuperate our soccer field that once was green and now is brown or without grass.
Location area: Near the main building
Steps to complete project:
The church in Carmelo has hired labor to remove the old roof of the church and replace it with a new one. When the roof is finished, they will be ready for the next phase of the building process, which is having skilled workers come to help with drywall, plumbing, electrical, tiling and painting.
The Carmelo missionary team is aiming to schedule work teams to begin in August or September of 2022 and beyond.
tienes videos antiguos de la misón en Chile?
Hola Felipe, lo único que tenemos es un video publicado por la UCB en Chile llamado “video documental Inicios de la UCB en Chile”