The LIFT group from the UK arrived yesterday in Chivilcoy to assist in camp construction, thanks to the work of UK home director Nigel and Charis Kissick. The team got to camp at about 1:30 p.m., met the work team from Maine, and 30 minutes later the group from Maine left for the airport on the same mini-bus. The picture below shows the progress on the plumbing and flooring in one of the cabin structures, with the main camp building in the background.