Chivilcoy Camp Progress

Work on one of the cabins is ongoing, starting from bare dirt. Preparation should be done tomorrow, and plumbing and concrete floor poured by Saturday. Pray for everything to come together to get the cabins “off the ground.”

bppnrq27

Some smaller concrete projects are ongoing as well. Here’s prep-work for one of them:

r0a0ojuo

Facebook
Twitter