The LIFT crew and the GMSA missionaries are advancing with the new cabin construction in Argentina. The ladies are pictured tying steel for the bond-beams that will be poured full of concrete at the top of the prefab walls. The electrical conduit is also being installed. Join us in thanking the Lord.


























