Skip to content
  • LEARN
    • About
    • Our Team
    • Fields of Ministry
    • Projects
    • History
    • Resources
      • Echoes from the Trenches Blog
      • Southern Sentinel Magazine
      • Coloring Pages
      • Events Calendar

    About

    Who We Are
    History

    Ministry

    Our Team
    Fields of Ministry
    Projects

    Resources

    Echoes from the Trenches Blog
    Southern Sentinel Magazine
    Coloring Pages
    Events
    Contact Us
  • PRAY
  • GIVE
  • GO
    • Career Missions
    • Short Term Trips
    • Survey Visits
    • Work Teams
    Career Missions
    Short Term Trips
    Survey Visits
    Work Teams
  • My Account
    • Donor
    • GMSA Team Member
Read more about the article News from Carmelo

News from Carmelo

  • Post published:August 30, 2021

Marian & Becky Proto - Carmelo, Uruguay "Teaching them to observe all things..." Matthew 28:20 We are so thankful for the faithful group of ladies who are eager to attend…

Continue ReadingNews from Carmelo
Read more about the article Vallette Family Summer 2021 Ministry

Vallette Family Summer 2021 Ministry

  • Post published:August 27, 2021

Thank you for your prayers this summer. It's been a great summer full of ministry opportunities for the whole family. Regarding our return to Chile it is still uncertain. There are still…

Continue ReadingVallette Family Summer 2021 Ministry
Read more about the article Winter Break: The Work Continues

Winter Break: The Work Continues

  • Post published:July 30, 2021

Dave & Patti West - Temperley, Argentina The Lord has heard and answered your prayers and by His grace our first semester with the Instituto Centro Bíblico was completed on…

Continue ReadingWinter Break: The Work Continues
Read more about the article Honey Out of the Rock

Honey Out of the Rock

  • Post published:July 12, 2021

Curtis & Diane Steward - Coquimbo, Chile Hello today from our gigantic gravel pit: At our back towers a cactus-clad hill that would take two days to climb—not that we’re…

Continue ReadingHoney Out of the Rock
Read more about the article Blessed with a New Tractor–Soon!

Blessed with a New Tractor–Soon!

  • Post published:May 21, 2021

More than three years ago, our old Someca tractor began having engine trouble and it was determined that the engine had to be rebuilt. After receiving an estimate, we decided…

Continue ReadingBlessed with a New Tractor–Soon!
Read more about the article Zeta, a Dog that Opens Doors

Zeta, a Dog that Opens Doors

  • Post published:May 18, 2021

Missionaries Sergio and Andrea Duarte in Uruguay send the following update, written from Andrea's perspective: Two years ago our family moved from a smaller town to a city of a…

Continue ReadingZeta, a Dog that Opens Doors

David and Patti West: It Has Begun!

  • Post published:April 16, 2021

Dear Praying Friends, “He is risen!!!” These words ring out with joy in a troubled and weary world.  We thank God for the truth of these words. Jesus was fully God,…

Continue ReadingDavid and Patti West: It Has Begun!

Dan & Liz Thompson On the Move

  • Post published:April 16, 2021

From Chile to the US and then (hopefully) soon to Uruguay! That is what Dan and Liz Thompson and their family is expecting in upcoming weeks and months. They report:…

Continue ReadingDan & Liz Thompson On the Move

Progress in Carmelo, Uruguay Church Building Project

  • Post published:April 16, 2021

Missionaries Mariano and Becky Proto report: Hi everyone, I like to share some photos that I took today on the advancement on the multipurpose building. I want to thank you all…

Continue ReadingProgress in Carmelo, Uruguay Church Building Project

Overseas Travel is Difficult!

  • Post published:April 15, 2021

Dan Vallette Missionary Dan Vallette reports on his brief trip back to Chile. Thank you for your prayers regarding my trip in February down to Chile.  The trip had its challenges:  A…

Continue ReadingOverseas Travel is Difficult!

A Year in Captivity

  • Post published:April 2, 2021

No, we haven’t got arrested (yet) for breaking our city’s second quarantine, but it’s a huge challenge to accomplish our errands in two 2-hour outings per week. At least we…

Continue ReadingA Year in Captivity

The Only Constant: Change

  • Post published:February 16, 2021

The Vallette Family Missionary Dan Vallette reports on the changes going on in their plans these days: As you are well aware, COVID has changed all our plans many times…

Continue ReadingThe Only Constant: Change
  • Go to the previous page
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • …
  • 14
  • Go to the next page

USA
1401 SW 21st Avenue
Fort Lauderdale, FL 33312

UK
8 Calmore Park
Tobermore Magherafelt
Co Londonderry, BT45 5PQ

CANADA
PO Box 14 Aylmer Stn. Main
Aylmer West, Ontario N5H 2R8

Facebook-f Instagram Youtube

© 2025 Gospel Mission of South America. All Rights Reserved.

Facebook-f Instagram Youtube

USA
1401 SW 21st Avenue
Fort Lauderdale, FL 33312

UK
8 Calmore Park
Tobermore Magherafelt
Co Londonderry, BT45 5PQ

CANADA
PO Box 14 Aylmer Stn. Main
Aylmer West, Ontario N5H 2R8

© 2025 Gospel Mission of South America. All Rights Reserved.

Industrial Cleaner

Goal: To help with the cleaning of the floors both in the main building and in the chapel area.

Location area: Main Building

Steps to complete project:

  • Purchase the machine
  • Start cleaning

PHASE 4: Playground Area

The goal is to build a game-friendly outdoor area for kids as well as a covered soccer field with wire netting and lights.

PHASE 3: Auditorium

This project includes demolition of existing walls to enlarge the auditorium space, along with the construction of two bathrooms, two Sunday school rooms and a foyer for reception.

PHASE 2: Parsonage

The church in Carmelo has hired labor to remove the old roof of the church and replace it with a new one. When the roof is finished, they will be ready for the next phase of the building process, which is having skilled workers come to help with drywall, plumbing, electrical, tiling and painting.

The Carmelo missionary team is aiming to schedule work teams to begin in August or September of 2022 and beyond.

Landscaping

Goal: To provide some green areas near the existing buildings.

Location area: Near buildings

Steps to complete project:

  • Preparation of the land
  • Installation of a sprinkler system
  • Seeding of grass
  • Building of paths
  • Planting of flowers, bushes and trees

Unity Game Expansion

Goal: To add a variety of obstacles to work through as a cabin. This is a vital part of our program; it promotes teamwork and reveals character traits.

Location area: Behind the boy’s cabin

Steps to complete project:

  • Gather materials
  • Build and install obstacles

Swings

Goal: Create a seating area to have devotions as a cabin or simply a relaxed place for conversations.

Location area: Various places around the camp

Steps to complete project:

  • Build wood seating benches
  • Build and install metal frame to hold the wood benches
  • Hang wood seating benches

Maintenance Area Upgrade

Goal: To have ample space to work on projects.

Location area: Close to the camp entrance. 

Steps to complete project:

  • Install sliding doors
  • Build a roof over the area
  • Cement the floor
  • Build shelves
  • Install electrical outlets
  • Purchase adequate tools to install on a more permanent basis

Soccer Field Restoration

Goal: To recuperate our soccer field that once was green and now is brown or without grass.

Location area: Near the main building

Steps to complete project:

  • Give a finishing touch to the underground water storage to be used
  • Install a new pump for irrigation
  • Install underground lines made of better material for the irrigation system
  • Purchase new water sprinklers with their correspondent flexible elbow
  • Add new soil to the soccer field

Pool Area (Stage 2)

Goal: To continue to provide an area where campers can find a place to cool off during the hot Chilean summers.

Location area: Pool area

Steps to complete project:

  • Repair and resurface the current pool walls and floor ✔
  • Install new plumbing and electrical system ✔
  • Construct new sidewalk area ✔
  • Install new pump, chlorination and filter system ✔
  • Construct a new metal fence ✔
  • Install artificial grass
  • Construct 2 shade areas
  • Construct a kids’ splash pool
  • Finish the outside fence perimeter made out of Gabon
  • New lighting system

 

Outdoor Eating Area

Goal: To create an outside eating area near the main building area.

Location area: Near the main building

Steps to complete project:

  • Install posts for hanging lights and shades
  • Construct gabion walls (with benches incorporated into the wall) to establish a perimeter
  • Installation of sinks
  • Construct permanent serving tables

Boys' Dorm Second Floor

Goal: Adequate housing for campers.

Location area: Current boys’ dorm

Steps to complete project:

  • Replace doors (10) and windows (10) on first level
  • Relocate current divisions on first level
  • Add new electrical system on the first and 2nd level
  • Remodel the current bathrooms for wheelchair accessibility
  • Install new siding on first level
  • Construct stairways
  • Remove roof
  • Build second level floor (steel frame)
  • Construction of outside walls and inside divisions.
  • Build rooms and bathrooms
  • Installation of windows and doors
  • Construction of bunk beds

Outdoor Gym Area

Goal: To provide an outdoor covered cement pad to carry on different programs and activities.

Location area: Back of the soccer field

Steps to complete project:

  • Level ground
  • Prepare the ground for the pouring of cement
  • Pour cement floor
  • Prepare footings for steal frame roof
  • Install roof
  • Installation of a lighting system

Main Building Second Floor

Goal: Utilize the high ceiling to create a second floor above the current dining area (50×50 feet / 15×15 meters). This would give us another large meeting area, a game room and a control room for the first floor.

Location area: Main building

Steps to complete project:

  • Cementing of metal posts
  • Construction of metal frame to support 2nd level
  • Install floor on 2nd level
  • Build divisions on floor of 2nd level
  • Insulate roof
  • Add windows and doors
  • Build new bathrooms on the 2nd level
  • Installation of a lighting system

Park Deck (Main Building)

In memory of Pastor Bill Park

Goal: Build an observation deck facing the soccer field and mountains, creating a seating area for meetings, devotions, meals, etc.

Location area: Main building

Steps to complete project:

  • Cementing steel posts
  • Construction of a steel frame (16.4×98.4 feet/5×30 meters)
  • Placement of deck material
  • Add stairs and lighting system

Landscape Secondary Parking

Goal: To have a green zone right outside the main building with adequate seating area (this also includes swings) to do follow up counseling sessions after meetings.

Location area: Next to main building

Steps to complete project:

  • Prepare ground for the new green zone
  • Add soil and plant seed in zone next to the main building
  • Add irrigation system for the new green zone
  • Add stairs and walkways
  • Add swings
  • Add solar lighting system

Main Building Addition: Chapel and Lobby

Goal: Create a chapel area next to the main building where a small group can meet. Currently the camp church plant group is in need of a bigger place to meet. This would serve not only for the church plant, but also as a new meeting room for the camp ministry. 

Location area: Next to main building

Steps to complete project:

Construct support pillars

  • Construct support pillars ✔
  • Extend existing roof ✔
  • Pour cement floor ✔
  • Build exterior walls ✔
  • Seal off exterior walls
  • Build bathrooms
  • Install electrical, water, and sewer lines
  • Build a loft
  • Install windows and doors
  • Buy equipment and furniture

Secondary Parking Area

Goal: Move current parking area (next to the main building) to the front of the boy’s dorm.

Location area: Main building area

Steps to complete project:

  • Level ground
  • Prepare ground for gravel
  • Add gravel to the parking area
  • Add solar lighting system
  • Add shade system

Second Storage Area

Goal: To provide an overflow room for extra staff or guests.

Location area: Behind the soccer field

Steps to complete project:

  • Build metal frame for walls
  • Build metal trusses to support roof Install roof
  • Build steps and ramp
  • Hang doors
  • Install electrical system
  • Install siding
  • Build a bathroom

Camper Scholarship

Goal: To offer campers that know the Lord the opportunity to invite an unsaved friend to camp.

Description of Scholarship: The average cost of camp in 2024 was $50. The saved camper who brings an unsaved friend to camp, and the unsaved friend, both get the scholarship to enjoy a free week of camp.

Approximate Cost:

  • $100 provides camp for two campers – one who needs the Lord
  • $200 provided camp for four campers – two who need the Lord
  • $300 provides camp for six campers – three who need the Lord
  • $400 provides camp for eight campers – four who need the Lord
  • $500 provides camp for ten campers – five who need the Lord

Game Area

Goal: Provide stationary group games for children and teens

Location area: Next to girl’s dorm

Steps to complete project:

  • Level ground
  • Prepare area to install games
  • Installation of solar lighting system
  • Installation of shade system
  • Add games like “spikeball”, “gagaball”, “nine squares in the air”, “human foosball”, etc.

Kid's Playground Area

Goal: Provide a place where children can play on traditional playground equipment with swings, slides, hanging bridges, etc.

Location area: Next to the sand volleyball area

Steps to complete project:

  • Level ground
  • Cement posts
  • Construct the playground area
  • Buy new equipment (swings, slide, etc.)

New Well

The original well dried up due to a prolonged drought in the area. An attempt to deepen the well was made but could only manage to go several feet. Water did come out, but not sufficient to irrigate, let alone to fill up the future pool.

Goal: To provide water for the soccer field, the bathroom building and other green areas

Location area: Next to the soccer field

Steps to complete project:

  • Contract a new drilling company
  • Select the new location to drill
  • Start to drill

      Our Spring Sale Has Started

      You can see how this popup was set up in our step-by-step guide: https://wppopupmaker.com/guides/auto-opening-announcement-popups/

      • My Account
        • Donor
        • GMSA Team Member
      Search
      • LEARN
        • About
        • Our Team
        • Fields of Ministry
        • Projects
        • History
        • Resources
          • Echoes from the Trenches Blog
          • Southern Sentinel Magazine
          • Coloring Pages
          • Events Calendar
      • PRAY
      • GIVE
      • GO
        • Career Missions
        • Short Term Trips
        • Survey Visits
        • Work Teams
      Contact Us